Installation Energy and Water

SERDP and ESTCP’s Installation Energy and Water program area supports the demonstration of innovative technologies to reduce DoD’s installation energy consumption and carbon footprint, improve energy security, and facilitate water conservation.

Active Projects List
Project Title Start Date

Patch Management/Continuous Monitoring and Detection for Energy Management Control Systems

Project Information
Project ID: EW18-5310
Principal Investigator: Mr. Michael Trautman, FoxGuard Solutions, Inc.
ESTCP Jul 2018

Targeted Retrofit Demonstrations using Simplified Screening for Envelope and Duct Leakage

Project Information
Project ID: EW18-5320
Principal Investigator: Dr. Mark Modera, University of California, Davis
SERDP Jul 2018

Fast and Secure Integration of Industrial Controls using a Common Configuration

Project Information
Project ID: EW18-5329
Principal Investigator: Mr. Julian Lamb, Paragon Robotics LLC
SERDP Jul 2018

Technology Transfer of an Installation Planning Tool for Energy, Water, and Waste

Project Information
Project ID: EW18-5291
Principal Investigator: Mr. Peter Ellis, Big Ladder Software, LLC
ESTCP Jul 2018

Secure Enclave for Demonstration and Legacy Control Systems (SEDALCS)

Project Information
Project ID: EW18-5355
Principal Investigator: Joseph Bush, USACE-ERDC-CERL
ESTCP Jun 2018

Virtual Power Station for Naval Facilities

Project Information
Project ID: EW18-5307
Principal Investigator: Luke Richards, Naval Facilities Command
ESTCP Jun 2018

Facility-related Control System Authorization Framework

Project Information
Project ID: EW18-5266
Principal Investigator: William Horner, RDECOM, CERDEC, NVESD
ESTCP Jun 2018

Military Energy Resilience Catalyst

Project Information
Project ID: EW18-5309
Principal Investigator: Mr. Michael Wu, Converge Strategies
ESTCP Jun 2018

Technology Transfer With Targeted Learning Credit Modules

Project Information
Project ID: EW18-5300
Principal Investigator: Mr. John Archibald, American Solar
ESTCP May 2018

Underground Thermal Energy Storage (UTES) Technology Transfer

Project Information
Project ID: EW18-5316
Principal Investigator: Mr. Charles (Chuck) Hammock Jr., Andrews, Hammock & Powell, Inc.
ESTCP May 2018

Performance-Based UESC Pilot for Unitary DX Equipment Maintenance

Project Information
Project ID: EW18-5363
Principal Investigator: Dr. Michael West, Advantek Consulting Engineering, Inc.
ESTCP May 2018

Building Automation System Enumeration and Configuration (BASEC)

Project Information
Project ID: EW18-5333
Principal Investigator: Billy Rios, Whitescope
ESTCP May 2018

Underground Thermal Energy Storage (UTES) as a DoD facilities UESC Energy Conservation Measure

Project Information
Project ID: EW18-5311
Principal Investigator: Christopher Hood, Gulf Power Company
ESTCP May 2018

Technologies Integration to Achieve Resilient, Low-Energy Military Installations

Project Information
Project ID: EW18-5281
Principal Investigator: Dr. Alexander Zhivov, U.S. Army ERDC-CERL
ESTCP May 2018

High Efficiency Dehumidification System – Additional Proof of Concept

Project Information
Project ID: EW18-5280
Principal Investigator: Mr. Scot Duncan, Conservant Systems, Inc.
ESTCP May 2018

Next Generation Advanced High-efficiency DX Air Conditioner Demonstration

Project Information
Project ID: EW-201717
Principal Investigator: Dr. Michael West, Advantek Consulting Engineering, Inc.
ESTCP Jan 2017

Demonstration and Cost Analysis of an Acoustic Building Infiltration Measurement System

Project Information
Project ID: EW-201719
Principal Investigator: Dr. Ralph Muehleisen, Argonne National Laboratory
ESTCP Jan 2017

Intelligent Building Management with Holistic Digital Lighting

Project Information
Project ID: EW-201720
Principal Investigator: Pedro Davalos, Honeywell International Inc.
ESTCP Jan 2017

Advanced Pressure Regulating Valves to Reduce Water Loss at DoD Industrial Installations

Project Information
Project ID: EW-201715
Principal Investigator: Mr. Gary Anguiano, Naval Facilities Engineering and Expeditionary Warfare Center (EXWC)
ESTCP Jan 2017

Develop and Integrate a DC HVAC System to an Existing DC Microgrid DoD Installation

Project Information
Project ID: EW-201725
Principal Investigator: Mr. John Saussele, Robert Bosch LLC
ESTCP Jan 2017

Energy Related

FY 2018 New Start Project Selections for the Environmental Solicitation - ESTCP
 

Optimization Study Executive Summary:
Financial Optimization of Electricity Security Assets at Military Installations: Including Case Studies of
Dover Air Force Base, Fort Benning, and MCAGCC Twentynine Palms (2014)
 

Optimization Study:
Financial Optimization of Electricity Security Assets at Military Installations: Including Case Studies of Dover Air Force Base, Fort Benning, and MCAGCC Twentynine Palms (2014)
 

Natural Gas Study:
Interdependence of the Electricity Generation System and the Natural Gas System and Implications for Energy Security (2013)
 

Microgrid Study:
Energy Security for DoD Installations

   
Solar Energy Development on DoD Installations in the Mojave and Colorado Deserts

   
  DoD Facilities Energy Directorate

Featured Initiatives

The latest developments in science, engineering, and technology.

Explore Featured Initiatives

Tools and Training

Put innovative research and technologies to work.

Access Tools & Training

Share