Fed Outside of DoD _ DoD Universities & Private Sector
skip to content
serdp and estcp logo
  • News
  • Blogs
  • Events
  • Mailing List
  • Search
  • About Us
  • Focus Areas
    All Focus Areas PFAS & AFFF Installation Resilience Corrosion & Repair Technologies Installation Restoration Munitions Response Sustainable Energetics Emissions & Waste Reduction
    All Projects Project of the Year
  • Tools & Training
  • Webinars
  • Working With Us

For mobile, landscape view is recommended.

Image

Enhanced Installation Water Resiliency

ESTCP, Installation Energy and Water Program Area

Released January 7, 2020

Closed March 5, 2020


FY 2021
  1. Working With Us
  2. ESTCP FY 2021 Solicitation

Objective

The Department of Defense (DoD) Installation Energy Test Bed sought demonstration projects of innovative technologies and approaches to improve the water resilience on military installations. Of particular interest were solutions that:

  • Improve DoD’s evaluation of water-related mission assurance risk on military installations.
  • Accurately and cost-effectively identify leaks in water distribution systems.
  • Supplement existing water sources for potable and non-potable applications including but not limited to consideration of improved desalination and water re-use technologies.
  • Improve situational awareness of water consumption and availability of supply.
  • Offer innovative business models for financing resilience improvements.

Proposals that included modifying or integrating with existing assets (e.g., privatized utility) that were owned or operated by non-DoD entities should have included the asset owner/operator on the project team. Proposals that addressed only unique site-specific needs were not considered responsive to the intent of this solicitation.

Funded projects will appear below as project overviews are posted to the website.

Background

Demand for water for all sectors in the United States is primarily met by surface water and groundwater resources. Water demand is expected to increase with population and economic growth in areas that include those susceptible to drought. In many regions, surface water resources are already fully allocated under non-drought conditions and groundwater withdrawals exceed the rate of recharge, which leads to declining groundwater storage, sea water intrusion in coastal aquifers, and, in some cases, land subsidence. State water managers in 40 out of 50 states expect freshwater shortages to occur in their states in the next 10 years.1

Military installations depend on reliable and secure sources of water to ensure mission execution, for both human sustainment and for supporting industrial and operational processes. Installation water projects are commonly implemented through Utility Energy Services Contracts (UESC) or Energy Savings Performance Contracts (ESPC). These project financing mechanisms require that the implemented project produce a utility (water) cost savings sufficient to pay back the capital improvement within 10-20 years. Since the early 2000s, DoD made notable progress reducing potable water use intensity through implementation of cost-effective projects; however the low cost of water is making it hard for water savings projects to meet the financial performance required for UESCs and ESPCs. While these project financing mechanisms are useful for improving water use efficiency, they do not provide for developing new sources or improving the security/resilience of existing water sources.

1 National Science and Technology Council. (2018), Coordinating Strategic Plan to Advance Desalination for Enhanced Water Security

serdp and estcp logo
 

Strategic Environmental Research and Development Program (SERDP)

Environmental Security Technology Certification Program (ESTCP)

 
 
serdp and estcp logo
  • News
  • Blogs
  • Events
  • Mailing List
  • Search
  • About Us
  • Focus Areas
    All Focus Areas PFAS & AFFF Installation Resilience Corrosion & Repair Technologies Installation Restoration Munitions Response Sustainable Energetics Emissions & Waste Reduction
    All Projects Project of the Year
  • Tools & Training
  • Webinars
  • Working With Us

For mobile, landscape view is recommended.

 

4800 Mark Center Drive, Suite 16F16, Alexandria, VA 22350-3605

Phone (571) 372-6565

Contact | Accessibility | FOIA Requests | Privacy Policy | Copyright Information | Media/Press